A practical start: 10-pair MOQ
Start a focused glove project from 10 pairs. Bring the intended cut, palm, colourway and size split together before approving your quotation. Small first orders let you review fit and branding before expanding the range.
Materials and construction choices
Choose from German Contact, Giga, Aqua, Mega and Super Soft palm options. Negative, roll finger, flat and hybrid constructions let you build a range around different fit preferences. Complete the brief with backhand materials, wrist closure, finger-support options and branded packaging.
Sample, approve, produce
Allow approximately 15 days for sampling and approximately 30 days for bulk production after sample approval. A complete brief reduces avoidable revisions. Keep the approved sample, measurements and artwork together as the production reference. Transit time is additional.
Built for your market
We work with briefs for the UK, United States and Australia. Include your destination, selling channel, required labelling, size range and preferred delivery basis so these can be addressed with the quotation.
Quality starts with an agreed reference
Review the palm reference and layer thicknesses, dimensions, stitching, bonding, artwork and packaging. Agree the inspection points and any test requirements before production. Product certificates or third-party test reports are supplied only where applicable to the actual order.
| Project detail | Starting point |
|---|---|
| Manufacturing | China |
| Minimum order | From 10 pairs |
| Sampling | Approximately 15 days |
| Bulk production | Approximately 30 days after sample approval |
| Primary markets | UK, US and Australia |
